Availability: | |
---|---|
Quantity: | |
Product Advantages
RO membrane elements with end-locked connections, high effective membrane area and low energy consumption desalination reverse osmosis membrane elements with ultra-low energy consumption and single-stage design achieve the perfect combination of high productivity and high desalination rates and are ideally suited to isosaline and medium temperature feed water conditions. In addition, it is ideal for two-stage desalination designs or high salinity brackish water applications.
Specifications and Major Properties
Model | Average Permeated Flow GPD (m3/d) | Stable Rejection Rate (%) | Minimum Rejection Rate (%) |
IWL 21-8040 | 10000(37.8) | 99.5 | 99.2 |
IML 22-8040 | 1 1000(41.5) | 99.5 | 99.2 |
IWL 21-4040 | 2500(9.4) | 99.5 | 99.2 |
Testing Conditions:
Testing Pressure: 225 psi (1.55Mpa)
Temperature of Testing Solution: 25°C
Concentration of Testing Solution (NaCl): 2000ppm
pH Value of Testing Solution: 7.5
Recovery Rate of Single Membrane Element: 15%
Extreme Operation Conditions
Max. Working Pressure: 600psi(4. 14Mpa)
Max. Feedwater Flow: 75gpm(17 m3/h) (8040)
16gpm (3.6 m3/h) (4040)
Max. Feedwater T emperature: 45°C
Max. Feedwater SDI: 5
Residual chlorine Concentration of Feedwater: < 0.1ppm
pH Range of Feedwater during Continuous Operation: 3~10
pH Range of Feedwater during Chemical Cleaning: 2~12
Max. Pressure Drop of Single Membrane Element: 15psi(0.1Mpa)
Dimensions of Membrane Element
All dimensions are shown in: millimeter (inch)
Operating Precautions
To prevent potential membrane damage during start-up, shutdown, cleaning or other processes, avoid any sudden pressure or mis-flow flow changes in the rolled element. During start-up, we recommend a gradual transition from standstill to operation according to the following procedure.
1. The feed water pressure should be gradually increased over a time frame of 30 to 60 seconds.
2. The increase to the design mis-flow rate should be reached gradually over a period of 15-20 seconds.
3. The product water should be drained and not used within the first hour.
Product Advantages
RO membrane elements with end-locked connections, high effective membrane area and low energy consumption desalination reverse osmosis membrane elements with ultra-low energy consumption and single-stage design achieve the perfect combination of high productivity and high desalination rates and are ideally suited to isosaline and medium temperature feed water conditions. In addition, it is ideal for two-stage desalination designs or high salinity brackish water applications.
Specifications and Major Properties
Model | Average Permeated Flow GPD (m3/d) | Stable Rejection Rate (%) | Minimum Rejection Rate (%) |
IWL 21-8040 | 10000(37.8) | 99.5 | 99.2 |
IML 22-8040 | 1 1000(41.5) | 99.5 | 99.2 |
IWL 21-4040 | 2500(9.4) | 99.5 | 99.2 |
Testing Conditions:
Testing Pressure: 225 psi (1.55Mpa)
Temperature of Testing Solution: 25°C
Concentration of Testing Solution (NaCl): 2000ppm
pH Value of Testing Solution: 7.5
Recovery Rate of Single Membrane Element: 15%
Extreme Operation Conditions
Max. Working Pressure: 600psi(4. 14Mpa)
Max. Feedwater Flow: 75gpm(17 m3/h) (8040)
16gpm (3.6 m3/h) (4040)
Max. Feedwater T emperature: 45°C
Max. Feedwater SDI: 5
Residual chlorine Concentration of Feedwater: < 0.1ppm
pH Range of Feedwater during Continuous Operation: 3~10
pH Range of Feedwater during Chemical Cleaning: 2~12
Max. Pressure Drop of Single Membrane Element: 15psi(0.1Mpa)
Dimensions of Membrane Element
All dimensions are shown in: millimeter (inch)
Operating Precautions
To prevent potential membrane damage during start-up, shutdown, cleaning or other processes, avoid any sudden pressure or mis-flow flow changes in the rolled element. During start-up, we recommend a gradual transition from standstill to operation according to the following procedure.
1. The feed water pressure should be gradually increased over a time frame of 30 to 60 seconds.
2. The increase to the design mis-flow rate should be reached gradually over a period of 15-20 seconds.
3. The product water should be drained and not used within the first hour.
On August 20, 2025, the three of us took flight LA2696 from Santiago, the capital of Chile, to Lima, the capital of Peru. We arrived in Lima at 7:40 PM.Before coming to Peru, we had done extensive research on various aspects, including baggage weight limits, carry-on luggage regulations, passport re
July 25, 2025 – We departed from Terminal 2 of Beijing Capital International Airport and, after an 18-hour flight, arrived at O.R. Tambo International Airport in Johannesburg, South Africa. Located at the southernmost tip of the African continent, South Africa is bordered by the Indian Ocean to the
At 4:30 a.m. on August 15, 2025, the three of us boarded a bus to Shijiazhuang Zhengding Airport. This time, our destination was South America. We planned to spend 28 days visiting clients in four countries: Chile, Peru, Venezuela, and Mexico.The official language in South American countries is Span